Sunday, April 18, 2010

More Flooring 04-16-2010

The tub surround was tiled.


The kids bathroom floor was tiled.


The living room and dining room floor has been prepared for the wood flooring.

Sidewalk and Garage Pad Forms Are Set 04-15-2010

The forms have been set for a sidewalk to the driveway and for a pad outside the garage. Eventually we'll have a concrete drive but it will stay gravel for now. The forecast is lots of rain so it will be next week before the concrete is poured.



The Master Shower 04-14-2010

The master shower has been tiled, but not grouted.



Flooring Installation Begins 04-09-2010

The flooring guys have tiled the kitchen, breakfast area and master bathroom.


They also tiled the backsplash in the kitchen.

Septic System Installed 04-07-2010

The septic system was installed. It took 3 days.

Thursday, April 1, 2010

The Countertops Are Installed 04-01-2010

The granite contractors came and installed the countertops.
The kitchen is Moon Valley (Brazil).


One kids vanity is Autumn Brown (Canada).


And the other kids vanity is Crema Bordeaux (Brazil).


The master vanity is also Moon Valley but I forgot to get a picture of that. The Moon Valley was all from the same slab. The kids vanities were small enough to use "remnants" from the granite contractors previous jobs at a significant discount. There were many remnants to choose from. It made for a fun day going through all the slabs, seeing all the variety.