The electrician came out and got all the plugs, switches, ceiling fans, and light fixtures installed. The electric company switched the power from the temporary pole over to the house. Sears delivered all the appliances and those were installed too, if possible. The dishwasher must wait for the plumber and the stovetop has to wait for the granite countertop to be installed. And that just happens to be tomorrow at 9am.